| Place of Origin: | Made In China Hebei |
| Brand Name: | SOOME |
| Certification: | CE |
| Model Number: | SMBD-BNC |
| Minimum Order Quantity: | 1Set |
|---|---|
| Price: | Contact |
| Packaging Details: | Wooden case or plastic film;LCL or 20' Container |
| Delivery Time: | 45 Days /30 Days |
| Payment Terms: | L/C, T/T |
| Supply Ability: | 20 Pcs/month |
| Speed: | 150,200,250m/min | Blade&scorer: | 5&8,6&10,7&12 |
|---|---|---|---|
| Order Change: | 1-3s(servo Type) 3-8s(invert Type) | Precision: | ±0.5mm |
| Min.slitting: | 135mm | Min.scorer: | 0mm |
| Correction Range: | 200mm | Width: | 1800mm,2200mm,2500mm |
| Power: | 25kw,30kw,35kw | ||
| Highlight: | nc thin blade slitter scorer machine,computer controlled thin blade slitter scorer,precise cutting thin blade slitter scorer |
||
1 . Summarize
Product overview:As an important equipment of corrugated cadres,complete the high quality line of cardboard and precise cutting and the size is very precise.Adopt computer-controlled,automatic change order,and reduce waste,improve work efficiency.
2 . Features
1) High quality touch screen and PLC equipped composing the CNC system,connect to the production line.
2) High quality beeline rail and high-precision screw conveying guarantees the precision.
3) A memory of orders,realize non-stop automatic or manual change.
4) Speed synchronizes with board speed.Standard communication interface,easy to link with management system.
5) Alloyed steel thin-blades,sharp and long life of over 8 million meters,auto sharpening.
6) The knife for computer control automatic or manual knife sharpening,edge trimming knife,improve production efficiency.
7) Three types of scorers:convex to concave(three lines).convex to concave(five lines),convex to flat.
8) Two rows of scorers,realizes minimum scorer spacing is 0mm.
9) Computer control score-depth,high quality scorer,more steady.
10) Using the synchronous belt transmission ,low noise,prolong using time.
11) Standard motorized body left-right rectification system 200mm.
3. Technical index
| width | 1800mm | 2200mm | 2500mm |
| speed | 150,200,250m/min | ||
| Blade&scorer | 5&8,6&10,7&12 | ||
| Order change |
1-3s(servo type) 3-8s(invert type) |
||
| precision | ±0.5mm | ||
| Min.slitting | 135mm | ||
| Min.scorer | 0mm | ||
| Correction range |
200mm |
||
| power |
25kw |
30kw | 35kw |
| machine size |
3900*1800*2450 (mm) |
4300*1800*2450(mm) | 4500*1800*2450(mm) |
![]()
Contact Person: Angie Guo
Tel: 18713720658
Fax: 86-0317-7800709